Architecture

FBA Consulting, enjoys good reputation in architecture and consultancy wherever they are based. A good team of experts in all the relevant fields with supervision and monitoring systems in place earns the credibility of our customers. Our sincerity, commitment, dedication and consistency give us repeat orders. Our customers always want to come back to us and feel happy to be with us.

We are keen to create purposeful and peaceful ambience every time so that it is more than just a roof over the head. The creative spaces we would offer would get the best out of both people and space. Our architecture in fact breathes and has a soul.

Innovation, experience and enthusiasm through quality, people and their consistency are going to provide problem free architecture for our clients. The answers to all their questions and solutions to any problem they might have is what we hope to achieve through our service provision.

Our Architectural Services cover the following areas:
Arrow11 Urban planning
Arrow11 Concept design
Arrow11 Detailed design and documentation
Arrow11 Renderings & models
Arrow11 Specifications
Arrow11 Value management
Arrow11 Base building tenant representation
Arrow11 Sustainable design
Arrow11 Conservation design
Arrow11 Contract and site administration
Scope of Architectural projects:
Arrow11 A design brief that would address all the concerns of clients.
Arrow11 A meticulous site evaluation, analysis that would include both the existing and or proposed development.
Arrow11 Design and site development with structural design.
Arrow11 Sanitary, plumbing, drainage, water supply and sewerage design.
Arrow11 All technological gadgets like Electrical, electronic, communication systems and design.
Arrow11 Heating, ventilation and air conditioning design.
Arrow11 Elevators, escalators, Fire detection, Fire protection, Security systems and sprinklers.
Arrow11 A strict schedule detailing the periodic inspection and evaluation of all construction works and installations.
Other related works:
Arrow11 Landscape Architecture
Arrow11 Interior Architecture
Arrow11 Architectural Conservation
Arrow11 Retrofitting of Buildings
Arrow11 Graphic Design and Signage
The Seven Steps:
Step 1 : The Concept Design
Arrow11 That would ascertain client's requirements and examine site constraints and potential thoroughly.
Step 2 : The Preliminary Design and Drawings:
Arrow11 This would provide conceptual designs along with the preliminary estimate of cost area wise.
Step 3 : The Drawings for Client's statutory requirements:
Arrow11 Once the designs are finalized the detailed drawings are prepared to comply with statutory requirements for approvals.
Step 4: The working drawings and the tender documents:
Arrow11 This would mean generating the schedule of quantities from the working drawings. The specifications and schedule of quantities would also be generated. The preparation of estimate of cost would then help prepare the tender documents and contract documents.
Step 5: The Appointment of contractors and the selection of best tender:
Arrow11 This is an interesting process of inviting contractors with their tenders. The analysis and scrutiny would then help us recommend the appropriate contractor that is not necessarily based on price alone.
Step 6: The Construction:
Arrow11 Construction is the real thing and the most interesting part. The preparation and issue of working drawings would give clear and detailed instruction for the execution of works during construction. The approval of samples of various elements and components would then follow. The next step is to check and approve shop drawings and bills submitted by the contractor and any other vendor that might be involved. The periodic visits to the site of work at various stages are designed to offer interpretation of the drawings, specifications and the proper support. We would have conferences and meetings with clients, contractors and vendors to ensure that the project proceeds smoothly and on time. The daily and weekly reports form site supervisor are crucial to monitor and speed up the construction works. . (Appointed by the client) The Issue of Certificate of Virtual Completion of works is an integral part.
Step 7: The Completion:
Arrow11 It should always be a great joy in preparing and submitting completion reports. Obtaining of "Completion/Occupancy Certificate" from statutory authorities would follow this, wherever required.